Milestone model

Status: the SDLC baseline, accepted by the owner on 2026-11-23. Every point is the owner's decision unless marked proposed; a proposed point is settled in its own issue. The skills implement this step by step along the build order; until a step lands, they work as before.

Superseded for new milestones by milestone 24, a simple workflow (approved 2026-11-28): one page per milestone, its rules and reviews, and issues in the intake template, in the private docs/specs/m24-simple-workflow/. This page stays until the skills follow milestone 24. Issue numbers without a repository are <owner>/claude; aise#n is <owner>/aise-feecheck-poc. Numbers in examples (milestone 24, #655, #656) are aise's and only illustrate. "Release" means the start of work on a milestone, not a production deploy.

Reviewed by: six per-diagram reviews, a full Fable review and an Autonomous-milestones review (2026-11-23); their findings are worked in.

Earlier decisions this reverses or changes

Where Earlier decision Now
#677, decision 1 one anchor [Epic] per milestone one [Spec] issue per milestone, the standing anchor
#677, decision 3 a goal epic sits above the anchor epic an [Epic] sits only over several milestones
#677, decision 7 a goal epic is required in every repository optional
#677, decision 10 a single-issue milestone links a short spec a single-feature milestone uses milestone.md as its spec
#942 (2026-11-21) a preflight finding has no override findings on the milestone spec may be accepted at release (decision 6); elsewhere #942 holds
#941 started = first closed_at or claim the goal is fixed from release (Ready)
#678 Anchor epic: key; Status: without Closed Spec issue: key; Closed added

Decisions

  1. Milestone and its [Spec] issue. One goal and one [Spec] issue (a new type beside [Epic], [Feature], [Task], [Bug], [Question]). The [Spec] issue is the milestone's standing anchor: open from Planning until Closed, home of the milestone spec, its amendments, the preflight findings, the close review and the Verification PR. Its PRs say Refs #n; the Verification PR closes it. milestone.md has:
    • spec part: what, why, the features at a high level, the milestone acceptance criteria MAC-n (the owner's own first, each marked O for owner or M for drafted, decided on #678), each with a Verify: line (decision 13); the redesigned data model and the test concept where the milestone needs them (decided on #678);
    • plan part: one line per item, proposed grammar P-3 feature "Change history" blocked_by: P-2 spec: own | in-milestone mode: subagents. spec: own means the feature gets its own mini-spec PR; spec: in-milestone means its AC-n are written in milestone.md and approved with it. The plan marks own for a new interface, a data-model change or a new screen.
  2. Epics. No epic inside a milestone. [Epic] is optional, over several milestones.
  3. Feature specs. Every [Feature] has its acceptance criteria committed before it is built: in its own mini-spec (spec: own) or in milestone.md (spec: in-milestone). A mini-spec is written as a spec PR on the feature issue, saying Refs #n, never Closes. A [Task] has a spec only when the plan says so. [Bug] and [Question] never (the fast lane). A single-feature milestone has no separate mini-spec.
  4. Files. docs/specs/m<milestone number>-<slug>/milestone.md and docs/specs/m<n>-<slug>/<issue>-<slug>.md. Existing flat docs/specs/<n>-*.md stay. A gate finds a mini-spec by its issue number across docs/specs/m*/ and by the issue body's link, so a moved feature is still found. Worker plans go to docs/plans/. .vale.ini already exempts docs/specs/**; docs/authoring/writing-docs.md (line 58) needs the new form.
  5. Approval. Every spec PR (milestone spec, own mini-spec, amendment) needs the owner's Approve. The coordinator's merge rules enforce it (#1004): a PR that touches the spec directory (the Spec templates key, else docs/specs/) is owner_approval, and owner:approved (#619) never covers it. A build PR that edits milestone.md or a mini-spec is owner_approval too. CODEOWNERS does not list the directory, so GitHub does not enforce the review.
  6. Release and preflight. The release is the owner's Approve on the milestone spec PR. Before it, the coordinator runs the preflight on the PR branch (proposed: preflight v2, a new issue; #617 reads only the default branch and the milestone's issues) and posts the findings. The worker lists the findings it cannot fix in an "Accepted at release" section of the PR; approving the PR accepts them. After Ready the preflight runs again over the created issues.
  7. Status line (#678's format, Closed added). Proposed: one writer, the repository's recorded coordinator, through one command (coordinator milestone-status) that re-reads the description and changes only that line; intake and owner-feedback hand their lines to it.

    Status Set when Workers may take
    Planning intake files the [Spec] issue the [Spec] issue's work, planning items it lists (data model, test concept, ADR, mockup, spike), bugs, questions
    Ready every plan item has its issue (decision 8) spec PRs, tasks, bugs, questions; builds of features whose spec is approved
    Running the first claim after Ready (informational) as Ready
    Re-plan pending a fit review says re-plan (#941) as Ready, except the issues judged re-plan
    Closing every issue is closed except the [Spec] issue and the human:do after-merge task (#620) the milestone checks, the close review, bugs, questions
    Closed the owner closes the GitHub milestone nothing

    The goal is fixed from Ready. Proposed migration: a milestone is gated only when its description has a Spec: line pointing at an m<n>- folder; others (milestone 24 among them) are not, and their free-text status stays as it is until the owner moves one over.

  8. From plan to issues. On the merge of the milestone spec, the coordinator starts intake in plan mode. Proposed: the owner's Approve counts as intake's yes; intake creates one issue per P-n (idempotent, so a crash resumes), writes the map P-n → #n into the milestone description, and hands Ready to the status writer once every item has its number. An issue that joins at Ready or later and is not in the map gets the fit review (#941).

  9. When a feature is built. Its spec is approved (own mini-spec merged, or in-milestone) and its blocked_by items are done. Proposed phase marker: a label spec:pending, spec:approved or spec:amending; the build is offered only at spec:approved. The build PR names the spec commit it built against, and the merge check refuses when the spec changed since. Tasks start when they exist, unless blocked. Bugs and questions run in every status but Closed. Proposed: a blocker is stuck when its branch, PR and issue show no activity for 14 days; the coordinator reports it and the owner chooses: wait, drop the dependency, or re-plan.
  10. The feature worker follows superpowers 7.0.2: re-check → plan (writing-plans) → build test first, inline (executing-plans) or with subagents (subagent-driven-development) → quality gate → change checks → push → PR → babysit-pr. The mode is the worker's choice unless the plan sets it. The worker approves its own plan.
    • The re-check always runs as the plan's first step; its one-line result goes into the build PR. Material change (an AC-n, its MAC-n, or an interface the spec names) → spec PR, phase spec:amending. Minor drift (wording, paths, names) → noted in the build PR. Obsolete → closed after the owner's yes.
    • A finding goes back to the stage that broke: build, plan, or a spec PR.
    • No claim is held while a feature waits; a worker claims at the start of each phase.
  11. Questions. First settled from the repository; then by a subagent one model tier above the asker (haiku → sonnet → opus → fable); then the owner. A worker reports with coordinator report … --owner-decision; intake and the coordinator put the question on the decision page directly. An asker already on the top tier goes to the owner. The answer is recorded in the spec PR, or on the issue for a fast-lane item. The advisor tool is a separate job: it reviews the asker's own decisions. Proposed: "Fable is never a worker model" (plugins/workflow/reference/worker-model.md) does not cover four roles: the advisor, the question subagent, the final reviewer, and the implementer of fix rounds 4–5.
  12. Advisor default. advisorModel in the dev-env baseline; baseline.json and Baseline.ps1 need a section for a scalar setting. Proposed value fable (the laptop's today).
  13. Milestone close. At Closing, on the [Spec] issue:
    1. Deploy the milestone's state to the system the checks run against; hand over the after-merge owner steps (#620).
    2. Milestone checks run against it. A failure does not stop the flow; the close review records it.
    3. Close review: a fresh subagent marks each MAC-n delivered, partial, dropped, unverified or pending UAT, with evidence, and re-checks the findings accepted at release. It writes ## Verification into milestone.md through a PR. A MAC-n without evidence is never delivered. An issue closed after its Reviewed: line makes it run again.
    4. UAT: the review generates the owner's checklist from the MAC-n and publishes it as a decision page; it is skipped when no MAC-n needs the owner. The read-back commits the results to the same PR.
    5. The owner approves that PR and closes the milestone. Gaps become follow-ups through intake after the owner's yes: into this milestone if the fit review says fits (the coordinator sets Running again), else into a new one.
  14. Tests by rule, not memory (proposed):

    Tier When Where Read by
    TDD unit tests each plan task worker implementer or worker
    Machine gate every push pre-push hook, CI worker, babysit-pr
    Change checks a PR whose diff matches a check's globs worker if it has the prerequisites, else CI or a host that has them babysit-pr, coordinator
    Nightly daily a scheduled runner job (claude has one: validate, 03:23 UTC, docs/ci/checks.md); aise moves from a session cron coordinator, via [Bug] Nightly … issues
    Milestone checks Closing the deployed system close review
    UAT after the close review the owner owner
    • New key Change checks: the Research checks grammar plus when <globs>, tool <name>, cost paid. New subcommand workflow_checks.py changed (today: keys, run). work-on and ready run the matched free checks the machine can and write one line per check into the PR body; babysit-pr never reports green while a matched check has no result.
    • New keys Paid test budget and Milestone checks; paid checks run in CI under run:paid, which the coordinator sets inside the budget (extends #651).
    • aise's e2e suite exists (frontend/app/tests/e2e/, five Playwright specs, run before each deploy) but is wired to a local app; the deployed run needs a base-URL override and a test account (the owner's decision; target environment in aise#596).
    • MAC-n carry Verify: e2e <spec>::<title> | eval <cmd> ≥ <n> | query <cmd> | screenshot <state> | uat; the preflight flags a MAC-n without one.
  15. Additions from the research pages (2026-11-23; the "adopt now" points of possible changes):

    • PR verification block. Every build PR carries one line per matched check with its result, and says "none" when no check matched; one result line per AC-n; and one line saying where a reviewer should look closely and why. babysit-pr never reports green while a matched check has no result.
    • What a review was made against. The build PR names the spec commit, or for an item without a spec the hash of the issue body; a later edit of either makes the review stale.
    • The re-check cites evidence. Its result names files and PR state, never a handoff note or a summary.
    • Shared-gap check. When two or more workers block or guess wrong in one round, the coordinator first looks for one gap in the setup, the spec or the issue template that explains them, before asking the owner each question.
    • Negative case for evaluations. A Verify: eval line names at least one case that must find or do nothing.
  16. Migrating a running milestone (decided 2026-11-26 from the pilot in aise milestone 24; the points are collected on #616, the decisions are recorded on the task, #1011). When a milestone that is already running moves to the model (decision 7):

    • Old holds, reviewed once. The coordinator checks each agent:hold and agent:parked of the milestone once against the model. A hold or park whose recorded reason is an earlier rule the model replaces is released by the coordinator, with one comment naming the model decision. Any other stays as it is.
    • The P-n map first. Migration starts with the map P-n → #n in the milestone description. Every open issue of the milestone that is not in the map gets the fit review (#941) then (decision 8).
    • A spec written after its build PR goes through a spec PR like any other (decision 5). The build PR stays open and is not merged before the spec is. Its worker then runs the re-check of decision 10 against the merged spec and writes the result line into the build PR.
    • A flat spec's MAC-n as acceptance criteria. In a migrated flat spec, a MAC-n that names exactly one issue and can be tested is that issue's acceptance criterion; no AC-n is written after the fact. A MAC-n that names several issues or cannot be tested needs a spec PR.

    Two rules hold for every milestone, migrated or not:

    • A hold or park never discards work. Before stopping, the worker commits everything and pushes its branch, with the hooks running. If a hook refuses the commit, the worktree is kept and the park comment says so.
    • Holding needs only the label. agent:hold, set from any host, holds an issue; removing the label ends the hold. A comment with the reason is recommended, not required. The coordinator refuses to start a labelled issue.

Owner touchpoints per milestone

Action 1 feature 5 features, 2 with own mini-specs
Intake input and answers 1 1
Approve the milestone spec (accepts findings, releases, starts issue creation) 1 1
Approve own mini-specs 0 2
Approve the Verification PR and close, after the UAT 1 1
Total before owner-path build PRs, questions, re-plans 3 5

Research additions in the diagrams

The Mermaid diagrams 4, 5, 6, 7, 9 and 10 carry the points the research pages add (possible changes):

Colour Meaning
amber, solid adopt now: part of the baseline, decision 15
violet, dashed later: a good addition that needs a decision or other work first

Diagram 1: hierarchy

Hierarchy

flowchart TB
    epic["[Epic], optional<br/>over several milestones"]
    subgraph ms["Milestone: one goal, due date, Status:"]
        spec["[Spec] issue, standing anchor<br/>milestone.md: spec + plan"]
        f1["[Feature], own mini-spec"]
        f2["[Feature], ACs in milestone.md"]
        t1["[Task]"]
        subgraph fast["Fast lane: no spec"]
            bug["[Bug]"]
            q["[Question]"]
        end
    end
    ms2["Another milestone"]
    epic -.-> ms
    epic -.-> ms2
    spec -- "plan creates" --> f1
    spec -- "plan creates" --> f2
    spec -- "plan creates" --> t1
    f1 -. "blocked_by" .-> t1

Diagram 2: spec files

Spec files

flowchart LR
    subgraph dir["docs/specs/m24-case-persistence/"]
        m["milestone.md<br/>MAC-n, plan, in-milestone ACs"]
        s655["655-optimistic-locking.md<br/>AC-n"]
    end
    specissue["[Spec] issue, its PRs (Refs)"] --> m
    pr655["[Feature] #655, spec PR (Refs)"] --> s655
    s655 -. "AC-n traces to MAC-n" .-> m

m24 = milestone 24; 655 = issue 655. A feature marked spec: in-milestone has no file of its own. No approved spec means no build. Plans: docs/plans/.

Diagram 3: milestone life cycle

Milestone life cycle

stateDiagram-v2
    state "Re-plan pending" as RePlan
    [*] --> Planning: intake files the [Spec] issue
    Planning --> Ready: spec PR approved and merged, then every plan item has its issue
    Ready --> Running: first claim
    Running --> RePlan: fit review says re-plan
    Ready --> RePlan: fit review says re-plan
    RePlan --> Running: owner picks a new milestone, another milestone, or a full re-plan
    Running --> Closing: all issues closed but the [Spec] issue and the after-merge task
    Closing --> Running: a follow-up fits this milestone
    Closing --> Closed: owner approves the Verification PR and closes
    Closed --> [*]

Who may work in each status: decision 7. Fit review: #941. Preflight: decision 6.

Diagram 4: from milestone spec to issues

From milestone spec to issues

flowchart LR
    intake["Intake<br/>owner + Claude"] --> specissue["[Spec] issue<br/>brainstorm, write"]
    specissue --> pr["Milestone spec PR<br/>spec + plan, Refs"]
    pr --> pre["Preflight v2 on the PR;<br/>Accepted at release section"]
    pre --> approve["Owner Approve<br/>= release + acceptance"]
    approve --> merge["Merge milestone.md"]
    merge --> plan["Coordinator starts intake,<br/>plan mode"]
    plan --> issues["One issue per P-n,<br/>map P-n to #n"]
    issues --> ready["Status: Ready;<br/>preflight over the issues"]
    rag["Retrieval checklist, when<br/>a milestone builds retrieval"]:::later
    pr -.- rag
    classDef adoptNow fill:#fde7c2,stroke:#b7791f,color:#000
    classDef later fill:#efe9f7,stroke:#7a5ea8,stroke-dasharray:4 3,color:#000

Diagram 5: one feature, end to end

One feature, end to end

flowchart LR
    start["[Feature] issue<br/>intent"] --> kind{"spec: own?"}
    kind -- "in-milestone" --> wait
    kind -- "own" --> b
    subgraph specphase["Spec phase: spec:pending"]
        b["Brainstorm"] --> ms["Mini-spec PR, Refs"] --> ap{"Owner"}
    end
    ap -- "changes requested" --> ms
    ap -- "dropped" --> drop["Issue closed, not built"]
    ap -- "Approve, merge" --> wait["spec:approved,<br/>wait for blockers, no claim"]
    wait -. "blocker stuck 14 days" .-> esc["Coordinator reports,<br/>owner decides"]
    esc -. "wait" .-> wait
    subgraph build["Build phase"]
        rc["Re-check"] --> pl["Plan"] --> bd["Build, TDD<br/>inline or subagents"] --> gt["Gate, change checks,<br/>push, PR, babysit-pr"] --> mg["Merge, Closes #n"]
    end
    wait --> rc
    gt -. "code defect" .-> bd
    gt -. "plan wrong" .-> pl
    gt -. "spec wrong" .-> ms
    rc -. "material change: spec:amending" .-> ms
    gap["Shared-gap check before<br/>asking the owner"]:::adoptNow
    esc -.- gap
    hand["Phase handoff line<br/>on the issue"]:::later
    wait -.- hand
    failed["Failed-run comment,<br/>owner restarts"]:::later
    wait -.- failed
    eff["Effort level<br/>beside the mode"]:::later
    pl -.- eff
    classDef adoptNow fill:#fde7c2,stroke:#b7791f,color:#000
    classDef later fill:#efe9f7,stroke:#7a5ea8,stroke-dasharray:4 3,color:#000

Diagram 6: re-check before building

Re-check before building

flowchart LR
    t1["Milestone spec amended"] --> q{"Material change?"}
    t2["A blocker's PR changed<br/>what the spec relies on"] --> q
    t3["Spec merged over 14 days ago"] --> q
    t4["New ADR or decision"] --> q
    q -- "no, or minor drift" --> plan["Plan; one-line result<br/>in the build PR"]
    q -- "yes" --> spec["Spec PR, spec:amending,<br/>owner Approve"]
    q -- "feature obsolete" --> close["Closed, after the owner's yes"]
    spec -- "merged" --> q
    cite["Result cites files and PR state,<br/>never notes or summaries"]:::adoptNow
    q -.- cite
    classDef adoptNow fill:#fde7c2,stroke:#b7791f,color:#000
    classDef later fill:#efe9f7,stroke:#7a5ea8,stroke-dasharray:4 3,color:#000

The re-check always runs as the plan's first step; the triggers only say when to look harder.

Diagram 7: questions and model + 1

Questions and model + 1

flowchart LR
    q["Question<br/>worker, intake or coordinator"] --> repo["Repository<br/>code, issues, docs"]
    repo -- "not answered" --> up["Subagent one tier up<br/>e.g. opus asks fable"]
    up -- "not answered, or asker on top tier" --> owner["Owner: decision page,<br/>needs:human, readback"]
    repo -- "answered" --> rec["Recorded: spec PR,<br/>or the issue (fast lane)"]
    up -- "answered" --> rec
    owner --> rec
    adv["Advisor tool: reviews the asker's<br/>own decisions at decision points"]
    log["Log questions the repository<br/>could not answer"]:::later
    repo -.- log
    classDef adoptNow fill:#fde7c2,stroke:#b7791f,color:#000
    classDef later fill:#efe9f7,stroke:#7a5ea8,stroke-dasharray:4 3,color:#000

Diagram 8: who does what

Who does what

Plan Feature specs Build Close
Owner brings the input; approves the milestone spec (release, accepted findings) approves own mini-specs approves needs:owner-approval PRs, merges needs:owner-merge PRs, answers questions, decides re-plans and stuck blockers UAT; approves the Verification PR; closes the milestone
Intake files the [Spec] issue; creates the issues from the plan — files late issues (with fit review) files follow-ups after the owner's yes
Coordinator preflight on the PR; starts intake on merge; writes Status: offers spec work offers builds at spec:approved; merges merge:agent and approved PRs; reports stuck blockers starts the milestone checks and the close review on the [Spec] issue
Workers write the milestone spec, planning items write own mini-specs re-check, plan, build, gate, PR, babysit-pr, merge label; never merge run the milestone checks
CI, AI review docs checks docs checks CI, change checks, Copilot, claude-review —

The operator refreshes the Question Board and tells a coordinator when answers wait.

Diagram 9: build phase

Build phase

flowchart TB
    rc["Re-check (diagram 6)"] --> pl["Plan: writing-plans,<br/>picks the mode"]
    pl --> mode
    subgraph mode["Build per plan task"]
        direction LR
        subgraph sad["Subagent-driven"]
            impl["Implementer subagent<br/>TDD"] --> rev["Task reviewer subagent<br/>spec, quality"]
            rev -. "rounds 1-3 resume, 4-5 fresh,<br/>one tier up, cap 5" .-> impl
        end
        subgraph inl["Inline (executing-plans)"]
            w["Worker builds every task<br/>TDD"]
        end
    end
    mode -- "after the last task" --> fin["Final whole-branch review,<br/>strongest model, one fix pass"]
    fin --> gate
    subgraph gate["Quality gate: workflow:ready"]
        direction LR
        s["/simplify"] --> cr["/code-review --fix"] --> sr["/security-review"] --> ak["aikido:scan"] --> mgate["machine gate"]
    end
    gate --> chg["Change checks<br/>matched by the diff"]
    chg --> push["Push: pre-push hook"]
    push --> pr["PR, babysit-pr: CI, Copilot,<br/>claude-review in parallel;<br/>5 fix rounds, 3 AI review rounds"]
    pr --> merge["Coordinator merges on merge:agent;<br/>owner on needs:owner-approval<br/>or needs:owner-merge"]
    hooks["Hooks on every edit, commit and push: table 9b"]
    mode -.- hooks
    vblock["PR verification block: a line per check,<br/>none too; AC-n results; where to look"]:::adoptNow
    pr -.- vblock
    hash["Spec commit or issue-body hash;<br/>a later edit makes the review stale"]:::adoptNow
    pr -.- hash
    cost["Usage and run metrics<br/>recorded at merge"]:::later
    merge -.- cost
    rules["Review rules read<br/>from the base branch"]:::later
    pr -.- rules
    flaky["Flaky check:<br/>no silent retry"]:::later
    chg -.- flaky
    prop["Property and<br/>differential tests"]:::later
    mode -.- prop
    second["Second-model<br/>plan review"]:::later
    pl -.- second
    pkg["Package registry<br/>check"]:::later
    gate -.- pkg
    ctxw["Context headroom<br/>warning hook"]:::later
    hooks -.- ctxw
    classDef adoptNow fill:#fde7c2,stroke:#b7791f,color:#000
    classDef later fill:#efe9f7,stroke:#7a5ea8,stroke-dasharray:4 3,color:#000

Diagram 9b: which check runs when

When <owner>/claude aise-feecheck-poc
Every Bash or PowerShell command dcg blocks destructive commands (user-level hook from dev-doctor) same
Every edit — formatter hook: spotlessApply on .java
Every git commit guard-commit.sh (no git add -A or commit -a, secret scan of the staged lines); git pre-commit: ruff, shfmt, shellcheck, PSScriptAnalyzer, docs lint guard-commit.sh; a hook blocks the commit when spotlessCheck fails; git commit-msg: type(#issue): summary
A worker tries to merge guard-merge.sh blocks it same
Each plan task targeted unit tests (TDD) same
Quality gate /simplify, /code-review, /security-review, aikido:scan, the machine gate same
Every push pre-push: the pre-commit hooks again, plugin checks and tests, Vale, Semgrep, gitleaks pre-push: ./gradlew build (offline; PIT on changed classes)
The diff matches (proposed Change checks) — postgresIntegrationTest (Docker), e2e, integrationTest and vertexAiIntegrationTest (paid)
PR CI, Copilot, claude-review required: build, secret-scan, pr-title, Aikido; Copilot, claude-review
Nightly validate on the self-hosted runner full PIT, postgresIntegrationTest (the owner's Linux host)
Before each deploy — e2e (build.yml deploy job)
Milestone close (proposed Milestone checks) — e2e against the deployed app, paid checks once, evaluation runs

aise's rows were taken from its CLAUDE.md and .githooks/; its CI settings were not checked line by line.

Diagram 10: milestone close

Milestone close

flowchart LR
    closing["Status: Closing<br/>on the [Spec] issue"] --> deploy["Deploy; hand over<br/>after-merge owner steps"]
    deploy --> checks["Milestone checks:<br/>e2e, paid, evaluation, docs"]
    checks --> review["Close review subagent:<br/>each MAC-n with evidence,<br/>Verification PR"]
    review --> uat{"Any MAC-n<br/>Verify: uat?"}
    uat -- "yes" --> page["Owner UAT on a<br/>decision page; readback<br/>into the PR"]
    uat -- "no" --> decide
    page --> decide{"All delivered?"}
    decide -- "yes" --> close["Owner approves the PR,<br/>closes the milestone"]
    decide -- "gap" --> follow["Follow-ups by intake,<br/>after the owner's yes"]
    follow -- "fits" --> running["Back to Running"]
    follow -- "else" --> newms["New milestone;<br/>this one closes"]
    neg["Eval Verify needs<br/>a negative case"]:::adoptNow
    checks -.- neg
    hidden["Hidden acceptance<br/>scenarios for MAC-n"]:::later
    checks -.- hidden
    inv["Invariant checks<br/>per repository"]:::later
    checks -.- inv
    audit["Prompt audit of<br/>CLAUDE.md and skills"]:::later
    checks -.- audit
    prev["Per-PR preview<br/>before the UAT"]:::later
    deploy -.- prev
    lessons["Lessons: misses and run data<br/>feed checklists, owner's yes"]:::later
    review -.- lessons
    sample["Owner samples<br/>close-review verdicts"]:::later
    review -.- sample
    retire["Archive specs<br/>after the close"]:::later
    close -.- retire
    classDef adoptNow fill:#fde7c2,stroke:#b7791f,color:#000
    classDef later fill:#efe9f7,stroke:#7a5ea8,stroke-dasharray:4 3,color:#000

Diagram 11: spec levels and Anthropic's playbook

Spec levels and Anthropic's playbook

Level Here Approved by Playbook Differs
Intent the issue body; the milestone description intake's reviewer, the owner's yes intent.md not a file here
Milestone spec + plan milestone.md owner, spec PR spec.md + plan.md at milestone scope the playbook has no milestone level
Feature spec own mini-spec, or criteria in milestone.md owner, spec PR spec.md —
Plan writing-plans output in docs/plans/ the worker plan.md an engineer approves plan.md there
Tests and code TDD, one PR gate, reviews, merge label PR gates —
Milestone close checks, close review, UAT owner verifier subagent; release gate before production the UAT is this model's own

More illustrated diagrams

Where an epic sits relative to milestones

Dependencies inside a milestone

Spec and plan at two levels

Feature worker stages following superpowers

The illustrated diagrams are standalone SVG files in diagrams/, generated with light and dark colours; the Mermaid blocks are the detail versions. Proposed for the SDLC chapter (#985): the illustrated ones on the overview page, Mermaid on the detail pages.

Open

  • Proposed points above, for the owner: plan grammar, preflight v2, phase labels and spec commit check, status writer, migration rule, stuck-blocker rule, Fable exemptions, the test keys.
  • aise: a test account for the deployed e2e run; the target environment (aise#596); whether milestone 24 moves to the new model.
  • Issues: rewrite #616, #620 (exclusion at Closing), #678, #679, #681, #941, #942; close #676 and #677 as superseded once the work-items task is filed; keep #680, #682 (add [Spec]); new: [Spec] type and work-items reference, spec gate and merge kind, status writer, preflight v2, work-on phases, change and milestone checks, advisorModel baseline. Shipped code and docs to update: the anchor lookup of the preflight in coordinator.py, docs/sdlc/milestones.md, docs/sdlc/work-items.md, docs/sdlc/decisions.md.
  • Skills that still put [Epic] inside a milestone: workflow:intake, workflow:workstream, git-flow:github-issues examples.
  • SDLC v2: the decision record first, then the outline #985, the restructure #986 after the work-items reference.

Build order (proposed)

  1. Spec gate (classify and start skip the build of a [Feature] without an approved spec in a gated milestone; work-on checks it too) with the spec merge kind and Refs for spec PRs.
  2. Status parser and writer.
  3. [Spec] type and the work-items reference, then #682.
  4. The template, #678 → preflight v2 with #942 → intake plan mode, #679 → #941 → #681 with #620.
  5. Change checks, then milestone checks.
  6. advisorModel baseline, independent.